Installation of Water Meters at Cooper River Court

The installation of new water meters, water lines, taps, backflow preventers, as well as associated roadway and site demolition and construction.
  Drawings (click to expand/collapse)
Name Size
CHA METER PLAN 7-20-20 8.1 MB