SCDC Leath CI - Boiler Replacement

Replacement of Boiler 1 (B-1) with a new 125 HP natural gas-fired hydronic boiler. Replacement of the existing primary and secondary pumps. Addition of a new refrigerant leak detection system and air-purge fan. Electrical work shall be performed as required.
  Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Leath CI Boiler Addendum 1_09232020 728.0 KB