SCDC Leath CI - Boiler Replacement

Replacement of Boiler 1 (B-1) with a new 125 HP natural gas-fired hydronic boiler. Replacement of the existing primary and secondary pumps. Addition of a new refrigerant leak detection system and air-purge fan. Electrical work shall be performed as required.
  Specs (click to expand/collapse)