Hollings Cancer Center Mechanical Equipment Replacement

Replace (2) air handling units currently in the HCC 4th floor mechanical room with (1) rooftop air handling unit and (1) air handling unit in the mechanical room. See full description in the project manual.

Status

Accepting Bids

Prebid Date10/14/20 1:00 pm

Bid Date11/5/20 10:00 am

Company & Contacts

MUSC

Bob Branson   843.792.7502

Location

86 Jonathan Lucas St, Charleston, SC 29425

Replace (2) air handling units currently in the HCC 4th floor mechanical room with (1) rooftop air handling unit and (1) air handling unit in the mechanical room. Demolish (1) abandoned roof-mounted air-cooled chiller and associated pumps and piping. Replace (1) water-cooled chiller within mechanical room and associated pumps and piping. Replace (2) cooling tower cells on the roof an associated pumps and piping.

No partial sets allowed.

Only those names on the plan holder list will receive addenda.

Printed addenda are additional.

Shipping and handling is additional.

For printing related questions, please call 843.853.5066.