Daniel Library HVAC Replacement; Ph. 2 - Central Air Conditioning

HVAC replacement includes, but is not limited to, selective demolition, a cooling tower, steam-hot water heat exchanger, hot water pumps, steam condensate pump, air handling units, ductwork, piping, and electrical. This project is a mechanical prime. Bidders shall be licensed Mechanical Contractors; Group 5
  Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
17222_210218_CIT Daniel Library Phase 2_Addendum 1 4.1 MB
  Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
17222_210219_CIT Daniel Library Phase 2_Addendum 2 88.1 KB
  Bid Tab & Intent to Award (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Notice of Intent and Bid Tab 532.1 KB