Detention Services and Equipment Upgrades Leath CI - Chiller Replacement

Replacement of two existing 230 tons with new centrifugal magnetic bearing units of equal capacity. System shall be converted from a variable primary, constant speed secondary system to a variable primary only system. Electrical work shall be performed as required to support mechanical.
  Drawings (click to expand/collapse)