SCDC Manning CI-Boiler Replacement Re-Bid

Rerouting existing hydronic heating water, domestic hot water, and domestic hot water recirculation piping to new Owner provided Pre-Engineered Boiler House (PEBH) to serve the existing Wards/Dormitory Building. Contractor shall be responsible for all utility piping and wiring 5’ outside of the building footprint to serve the PEBH. Contractor shall demolish all existing steam piping and equipment serving the Prison Industries Building and install a new gas-fired radiant heating system and control.
Date Company Contact
1617811570
4/7/21 12:06 pm
Construct Connect 30 Tech Pkwy South Suite 100
Norcross, GA 30092
Ardie Destor
Tel: 323-602-5079
1617876078
4/8/21 6:01 am
Dodge Data & Analytics 2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Tel: 413-376-7032
1617826172
4/7/21 4:09 pm
McCarter Mechanical, Inc. 685 John Dodd Road
Spartanburg, SC 29303
Theresa Doster
Project Administrator
Tel: 864-301-8502
Fax: 864-599-7886