UHE Air Handler 3 Replacement

Replace supply fan, preheat coil and cooling coil and demolish humidifier of existing AHU-3 to bring it back to design conditions. Demolish and replace pneumatic controls with digital controls and other Work indicated in the Contract Documents
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in to download
Name Size
UHE AHU 3 Replacement Addendum 1 Narrative 119.4 KB
Bid Tab and Intent to Award (click to expand/collapse)
This is available for download to registered users. Log in to download
Name Size
UHE AHU-3_Bid Tab & NOI 400.3 KB