Institute of Psychiatry (IOP) Cooling Tower Replacement

Replace and increase the existing cooling tower for 600 tons. Modifications of the chilled water and condenser water system so that both chillers can operate at the same time. Scope includes pipe connections, electrical, automatic temperature controls, structural and other Work indicated in the Contract Documents.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in to download
Name Size
IOP Cooling Tower 319429.P1 - Addendum No 1. - Bound Documents 25.2 MB