Institute of Psychiatry (IOP) Cooling Tower Replacement

Replace and increase the existing cooling tower for 600 tons. Modifications of the chilled water and condenser water system so that both chillers can operate at the same time. Scope includes pipe connections, electrical, automatic temperature controls, structural and other Work indicated in the Contract Documents.

Status

Accepting Bids

Prebid Date1/18/22 10:00am

Bid Date2/15/22 10:00am

Company & Contacts

MUSC

Reginald Byrd   843-792-3753

Location

67 President St, Charleston, SC 29425

No partial sets allowed.

Only those names on the plan holder list will receive addenda.

Printed addenda, shipping/handling are additional.

Please note that all downloads are final and No Refunds will be given for digital goods
You must be logged in to download set

For printing related questions, please call 843.853.5066.