Institute of Psychiatry (IOP) Cooling Tower Replacement

Replace and increase the existing cooling tower for 600 tons. Modifications of the chilled water and condenser water system so that both chillers can operate at the same time. Scope includes pipe connections, electrical, automatic temperature controls, structural and other Work indicated in the Contract Documents.
Specs (click to expand/collapse)