Nowell Creek Pedestrian & Cycling Bridge & Path Re-Bid - #CP1426

Construction of a pedestrian and cycling path along Daniel Island Drive and across Nowell Creek. Total project length is approx. 1,100 LF. Work includes embankment construction, asphalt path, pervious concrete path, site-built boardwalks, prefabricated bridge, associated site work, signs and markings, traffic control and erosion / sedimentation control.
Drawings (click to expand/collapse)
Name Size
CP1426_NowellCreek - Bid Set 15.5 MB