MUSC Campus Connector Bridges: RFQ to Provide Construction Management at Risk

Construction of an elevated connector bridge adjacent to Doughty Street from the 2nd floor of the Ashley River Tower to the 2nd floor of the Bioengineering Building, including a connection from this new bridge to the Thurmond Gazes Building.

Status

Accepting Bids

Prebid Date 10/30/25 2:00pm
Bid Date 11/12/25 2:00pm

Company & Contacts

MUSC
Mark Lanning  
(843) 792-2490

Location

Charleston, SC

No partial sets allowed.

Only those names on the plan holder list will receive addenda.

Printed addenda, shipping/handling are additional.

Please note that all downloads are final and No Refunds will be given for digital goods
You must be logged in to download set

For printing related questions, please call 843.853.5066