MUSC Campus Connector Bridges: RFQ to Provide Construction Management at Risk
Construction of an elevated connector bridge adjacent to Doughty Street from the 2nd floor of the Ashley River Tower to the 2nd floor of the Bioengineering Building, including a connection from this new bridge to the Thurmond Gazes Building.
Status
Accepting Bids
| Prebid Date | 10/30/25 2:00pm |
| Bid Date | 11/12/25 2:00pm |
Location
Charleston, SC
No partial sets allowed.
Only those names on the plan holder list will receive addenda.
Printed addenda, shipping/handling are additional.
Please note that all downloads are final and No Refunds will be given for digital goods
You must be logged in to download set
For printing related questions, please call 843.853.5066

