MUSC Campus Connector Bridges: RFQ to Provide Construction Management at Risk
Construction of an elevated connector bridge adjacent to Doughty Street from the 2nd floor of the Ashley River Tower to the 2nd floor of the Bioengineering Building, including a connection from this new bridge to the Thurmond Gazes Building.
Plan Holders
| Date | Company | Contact |
| 10/24/25 2:19 pm |
Crowder Construction
6409 Brookshire Blvd.
Charlotte, NC 28216 |
EMILY GULLEDGE
ESTIMATING COORDINATOR
Tel: 7043481304
|
| 10/25/25 4:56 am |
Dodge Construction Network
2860 S State Hwy 161
Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
| 10/24/25 8:52 am |
James R Vannoy Construction
631 Mcgee Road
Anderson, SC 29625 |
Melvin Cline
Vice President
Tel: 8439987194
|
| 10/24/25 3:47 pm |
Monteith Construction Corp
208 Princess Street
Wilmington, NC 28449 |
Leland Franks
Business Development
Tel: 910-791-8101
Fax: 910-791-8260
|
| 10/24/25 10:38 am |
Whiting-Turner
900 Island Park Drive
Suite 150 Charleston, SC 29492 |
Kellen Stierli
Tel: 843-972-6400
|

